|
|
ETMRC N Scale Layouts
|
At 3200 Washington Street — Location Number 2
Scenes |

Right hand lobe – beginning plaster.
|

Right hand lobe, right side – beginning plaster.
|

Right hand lobe, right side – beginning plaster. Facing opposite
direction from previous picture.
|

Right hand lobe – beginning plaster.
|

Right hand lobe – beginning plaster. Tunnels and bridge
rough-in.
|

Left hand lobe – beginning paper.
|

Left hand lobe – beginning plaster.
|

Left hand lobe – paper before plaster. Long bridge now has extra
supports.
|

Left hand lobe, right side – beginning plaster. Long bridge now
missing supports.
|

Left hand lobe, left side – beginning plaster.
|

Left hand lobe, left side – beginning plaster.
|

Left hand lobe, right side – beginning plaster.
|

Left hand lobe, right side – bridges in place, white rock canyon.
|

Left hand lobe, left side – bridges in place, canyon walls painted,
river still white.
|

Left hand lobe, right side – scenery completed.
|