ETMRC N Scale Layouts

At 3200 Washington Street — Location Number 2
Building Preparation

The Junction at 3200 Washington Street

We moved into 3200 Washington Street, Greenville, Texas,
in October of 1988 and out in October of 1995.


The Junction at 3200 Washington Street

The mezzanine (formerly the office) is available for the N scale layout.


The Junction at 3200 Washington Street

The ceiling needed work. Note safe in corner.
Getting the safe downstairs was exciting.


The Junction at 3200 Washington Street

Stairs to ground level and the upstairs toilet.
Plywood for floor and drywall for ceiling and walls.


The Junction at 3200 Washington Street

Another view of the work to be done.


The Junction at 3200 Washington Street

Stair railing removed in preparation for new wall.


The Junction at 3200 Washington Street

Dry wall installed next to windows to ground level.


The Junction at 3200 Washington Street

Dry walling continuing. Ceiling has new drywall.
Stairwell is behind wall next to safe.
Safe hasn't made it downstairs yet.


The Junction at 3200 Washington Street

Ceiling has been painted in preparation for valences.
A wall was built to divide layout into two lobes.
Overhead lighting in process in the left hand lobe.
Broom visible in right hand lobe.


The Junction at 3200 Washington Street

The right hand lobe, lighting completed.